What the One Big Beautiful Bill Act Changed for Homebuilders in 2026 

Most homebuilders I speak with know the One Big Beautiful Bill Act passed in July 2025. Very few have checked what it did to their own contracts. Two changes land on every builder’s desk this year and both turn the contract file into a tax document as much as a legal one. 

The first is how income on a residential job gets taxed. The second is when a subcontractor needs a Form 1099. Neither is hard. The trouble is that both depend on paperwork most builders keep in a truck, an inbox and a lender portal, not in the books. Closing that gap is the whole job of good bookkeeping services for homebuilders: the contract, the draw & the ledger telling the same story. 

What changed for residential construction contracts? 

Before the new law a builder could skip the percentage-of-completion method fully only on a “home construction contract”. That is a contract where 80 percent of the estimated costs go to dwelling units in buildings with four or fewer units. Each townhouse or rowhouse counts as its own building. 

A “residential construction contract” is the same test without the four-unit limit. Think apartment buildings and larger condo projects. Those contracts were stuck on a 70/30 split. 70 percent of contract income and costs went through percentage of completion and only 30 percent could wait for completion. 

Section 70430 of the Act, Public Law 119-21, moved residential construction contracts into the full exemption. A builder can now use the completed-contract method or another exempt method on the whole contract, not just 30 percent of it. It applies to contracts entered into in tax years beginning after July 4, 2025. For a calendar-year builder that means contracts signed on or after January 1, 2026. Commercial and mixed-use jobs stay where they were, so anyone doing bookkeeping for construction companies with both kinds of work has to tag every contract by type from the day it’s signed. 

The IRS followed with Revenue Procedure 2026-32, published in Internal Revenue Bulletin 2026-39 on September 21, 2026. It gives automatic consent to change methods for these contracts on a cut-off basis. Cut-off means new contracts use the new method and jobs already running stay on the old one. Nothing gets restated. 

What does that mean in dollars? 

Say a builder signs a $6 million contract for a 24-unit apartment building in March 2026 with a 15 percent expected margin. By December 31 the job is half done. 

Under the old 70/30 rule, 70 percent of that half-finished contract went through percentage of completion. That is $2.1 million of revenue and $315,000 of gross profit taxed in 2026 on a building that isn’t finished or sold. Under the new rule, on the completed-contract method, that $315,000 waits until the building is done. 

That is real cash staying in the business in the year it’s needed most. The numbers here are illustrative, the mechanics are straight from the statute. 

Why is the contract file now a tax document? 

Two facts decide the treatment and both are fixed around the day you sign. 

  1. The 80 percent cost test. It is measured on estimated total contract costs as of the close of the tax year the contract was entered into. Keep that year-end estimate with the signed contract. 
  1. The completion estimate. The section 263A cost-capitalization rules still apply to these contracts unless two things are true. You expected at signing to finish within 2 years, or 3 years for a residential contract that isn’t a home construction contract. And your average gross receipts pass the section 448(c) test, which is $32 million for tax years beginning in 2026 under Revenue Procedure 2025-32. 

If the only record of the expected completion date is a conversation with the superintendent, that position is weak. Put the commencement date and the expected completion date in the contract or in a signed schedule attached to it. The lawyer drafting the contract and the CPA filing the return want the same sentence on paper. 

What does the $2,000 1099 rule change for subcontractors? 

Section 70433 raised the Form 1099-NEC reporting threshold from $600 to $2,000 for payments made after December 31, 2025. Fewer small subs will need a form for 2026. 

Don’t stop collecting W-9s though. On the first payment you don’t know if a framer will cross $2,000 by December. And if a sub never gives you a taxpayer ID, backup withholding at 24 percent applies once payments become reportable. Get the W-9 before the first check, the same day you collect the certificate of insurance. 

Forms for 2026 payments are due February 1, 2027, because January 31 falls on a Sunday. 

Which records hold up in a lien or draw dispute? 

When an owner, a lender or a sub disputes a payment, the fight is rarely about the law. It’s about whose paper is better. These are the records that decide it. Each one should tie to the ledger. A folder on its own won’t do it. 

  1. Signed draw requests with the schedule of values, percent complete per line and the retainage held. 
  1. Lien waivers for every payment you make and receive. Conditional waivers before the money clears, unconditional once it has. Progress waivers for each draw, a final waiver at close-out. California and Texas both set the exact wording by statute, in Civil Code sections 8132 to 8138 and Property Code section 53.284, so a homemade form can fail. A construction attorney should confirm the right form for each state you build in. 
  1. Signed change orders with the price and the schedule impact, booked to the job the day they’re signed. 
  1. A job-cost ledger tied to each draw. Every invoice coded to a job and a cost line, so you can show what was spent against what was billed. 
  1. Retainage receivable and retainage payable kept as separate balances by job, not netted inside AR & AP. 

The test is simple. Pick any draw from last quarter. Can you pull the request, the matching waivers, the change orders behind it and the cost detail in ten minutes? If not, that’s a records problem long before it becomes a legal one. 

Who keeps this file is a cost decision. An in-house bookkeeper, a part-time contractor or an outsourced firm can all do it, and how much a bookkeeper costs varies quite a lot by model. End of the day the price matters less than one thing. Does one person own the monthly tie-out between draws, waivers and the ledger. 

What should a homebuilder do before December 31, 2026? 

  1. List every contract signed since January 1, 2026, or since the start of your first tax year beginning after July 4, 2025, and tag each one as home, residential or other. 
  1. Save the year-end cost estimate and the expected completion date with each signed contract. 
  1. Decide the method for new residential contracts and file the change under Revenue Procedure 2026-32 with the 2026 return. 
  1. Confirm a W-9 is on file for every sub paid in 2026 and flag anyone at or over $2,000. 
  1. Match every 2026 draw to its conditional and unconditional waivers. 
  1. Split retainage into its own receivable and payable balances for each job. 

Conclusion 

Public Law 119-21 made two changes every homebuilder should act on this year. Residential construction contracts entered into in tax years beginning after July 4, 2025 are fully exempt from percentage of completion, and Revenue Procedure 2026-32 lets you switch on a cut-off basis with no restatement. Form 1099-NEC reporting now starts at $2,000 for 2026 payments, with forms due February 1, 2027. 